Fencing
Fencing business software, from the gate quote to the install.
Evolution builds the systems behind some of Australia's largest industrial fencing companies. Price gates and posts from your own steel and settings, price installs from kits, then make, deliver and install from the same Project. Xero keeps the books.
- Gates
- Sized and costed for youframe, cut lengths, route, powder coat
- Posts
- Length works itself outcut sheet written onto the line
- Olympic Group
- 80+ admin hours a week savedfence and gate manufacturer
Where it goes wrong
A fencing margin leaks between the quote, the shop and the site.
Gates are priced off a spreadsheet, posts are cut from memory, and the install is a per-metre guess. Evolution prices each one from your own steel and settings, and keeps it on one record.
01
Every gate priced by hand
The Gate Builder sizes the frame, works out every cut length and adds the gate with its bill of materials.
02
Posts cut from memory
Post length is worked out from the footing, mesh height and barb rows, and the cut sheet goes onto the line.
03
Installs priced by feel
Install kits price every bay from its parts: fabric, post, footing, top and labour.
04
Retyped for the factory
The accepted quote becomes the Project, so the shop makes what was sold, with the bill of materials intact.

Gates
Enter the opening. The Gate Builder does the rest.
Open the chainlink Gate Builder from the quote, enter the opening and the height, and pick single or double, barb top and fabric. It sizes the frame, works out every cut length and adds the gate to the quote with its full bill of materials.
- Single or double, plain or barb top, in your own fabric and pipe
- The finish picks the factory route, with process times from your settings
- Powder coat charged on the frame's measured area

Posts
The post length works itself out.
Pick a post and the Post Builder can open by itself. Single, double or triple pipe, end, corner or intermediate. Change the mesh height or the barb rows and the post length follows, and the cut sheet is written onto the line for the workshop.
- Footing, clearances, mesh and barb rows in the length
- Baseplates, gussets and coating
- Cut, weld and notch labour from your own rates

Installs
Price a 120 m install from one kit.
Add forty 3 m bays and the usual options are already ticked. Pick a concrete footing and the truck concrete comes with it, in cubic metres, multiplied by every bay. Switch to baseplated and the screw bolts follow. Each part lands on the quote as its own costed line.
- Pick-one groups for fabric, post, footing and top
- Multi-select site extras, added once per Project
- Kits inside kits, with quantities multiplied down the levels
Video · 2:05
Watch a fencing Project, from the quote to the install.
A chainlink gate, posts from the Post Builder and a 120 m install priced from kits, then the Project, the production order, the dispatch and the install, on our demo company.
Make and deliver
From the quote to the factory to the truck.
When the customer says yes, the quote becomes the Project. Gates and posts go to the factory on your own routes, then picking slips, dispatches and runsheets come off the same Project. Delivery dockets carry a Track link, and the customer signs on the driver's phone.
Install and bill
Crews, subcontractors and claims.
Installs go on the planned activities calendar with the crew booked, and each visit carries its site instructions.
- Subcontractor claims paid by RCTI
- Progress claims and retentions
- Project costing and WIP
- Invoices and bills to Xero, payments back
Also in Evolution
The rest of the fencing business, on the same system.
Everything else a fence and gate business runs, in the one per-user price.
- Quote types, templates and pricebooks
- Contract pricing for builders
- Cash sales for walk-in trade customers
- Mesh, wire, pipe and fittings by branch and bin
- Min/max reordering
- Production orders and the factory workbench
- Timesheets against the Project
- Two-way Xero sync
Questions
Fencing questions
Can it price chainlink gates?
Yes. The chainlink Gate Builder sizes the frame from the opening and height, works out every cut length, and adds the gate to the quote with its bill of materials.
Does it work out post lengths?
Yes. The Post Builder works the post length out from the footing, mesh height, barb rows and clearances, costs baseplates, gussets and labour, and writes the cut sheet onto the line.
Can we price installs per bay?
Yes. Install kits price each bay from its parts, with pick-one and multi-select options and kits inside kits, so quantities like concrete and screw bolts work themselves out.
Is the Fencing Industry Toolbox in the per-user price?
The Fencing Industry Toolbox is an add-on, so ask us about it. Everything else on this page is in the one per-user price.
Do we need to replace Xero?
No. Xero keeps the books. Invoices and bills go to Xero, and payments come back.
Book a demo
See the whole flow in one demo.
We’ll walk you through a working demo company, from quote to factory to truck to invoice, and answer your questions as we go.
